CRA 106 NO. 15A-25 Zona Franca Bogotá
info@grupozfb.com
Zetta Data Center Complex is designed and built to achieve a PUE of 1.4 at Full Load.
Cooling system n+1 configuration compliant with the Uptime Institute standards for TIER III Data Centers.
Its design, along with its equipment technology, allows it to reach a PUE of 1.4 at full load enabling high energy efficiency.