previous arrowprevious arrow
Data Center Zetta Energía
Data Center Zetta Carrier Neutral
Data Center Zetta Free Cooling
Data Center Zetta PUE 1.4
Slide 1
High Energy Efficiency

Zetta Data Center Complex is designed and built to achieve a PUE of 1.4 at Full Load.

Slide 2
Higher Connectivity

14 broadband communications providers

Slide 3
Free Cooling System

Cooling system n+1 configuration compliant with the Uptime Institute standards for TIER III Data Centers.

Slide 3
High efficiency, redundant power suply

Its design, along with its equipment technology, allows it to reach a PUE of 1.4 at full load enabling high energy efficiency.

next arrownext arrow

1.4 PUE AT FULL LOAD

Its design, along with its equipment technology, allows it to reach a PUE of 1.4 at full load enabling high energy efficiency.

profile-pic

Redundant distributed configuration made up of three independent electric buses

to achieve the highest levels of availability.

EN-name9
profile-pic

Reliable energy from the best distributor in the country

and backed by state-of-the-art generation units.

EN-name8
profile-pic

ZETTA DC COMPLEX supplies a 7.3 MG reliable

and supported energy capacity.

EN-name6
profile-pic

Located within the Bogota Free Zone,

DC ensures up to 15% savings in energy rates.

En-name7
profile-pic

Daily supply fuel tanks for power plants with

12-hour continuous operation capacity guaranteed.

En-name4
profile-pic

State-of-the-art, high efficiency POWER

PLANTS with low emissions and low fuel consumption.

EN-name3
profile-pic

12-minute UPS power supply

for Data Center IT load.

EN-name
profile-pic

High efficiency, redundant power supply

system with 2 independent power sources per module.



En-name1
profile-pic

SISTEMA DE ALIMENTACIÓN REDUNDANTE DE ALTA EFICIENCIA,

con dos fuentes de alimentación diferentes para cada módulo.

name1
profile-pic

DISPONIBILIDAD DE UPS CON AUTONOMÍA DE 12 MINUTOS

de soporte de energía para la carga TI del Data Center.

name
profile-pic

PLANTAS DE GENERACIÓN DE ÚLTIMA TECNOLOGÍA Y ALTA EFICIENCIA,

bajas emisiones y bajo consumo de combustible.

name3
profile-pic

TANQUES DE SUMINISTRO DIARIO PARA COMBUSTIBLE DE LOS GENERADORES,

con capacidad garantizada de combustible para 12 horas de operación continua.

name4
profile-pic

304 kW capacity per room,

distributable in racks with an average density of 4 kW and up to 10 kW support per rack.

EN-name5
profile-pic

UBICADO DENTRO DE LA ZONA FRANCA DE BOGOTÁ,

ZETTA DC asegura ahorros en tarifas de energía de hasta el 15%.

name7
profile-pic

ZETTA DC COMPLEX SUMINISTRA UNA CAPACIDAD DE 7.3 MW

de energía confiable y respaldada.

name6
profile-pic

ARQUITECTURA REDUNDANTE DISTRIBUIDA, CONFORMADA POR TRES BUSES ELÉCTRICOS

independientes para alcanzar los más altos niveles de disponibilidad.

name9
profile-pic

ENERGÍA CONFIABLE DEL MEJOR DISTRIBUIDOR DEL PAÍS

y respaldada por equipos de generación de última tecnología.

name8

"The Zetta Data Center was designed, equipped and tested with a high-tech, redundant, Diesel combustion power generation system as the primary source, to respond to any expected operating conditions such as utility grid failures. It meets the highest regulatory standards while ensuring connectivity, operability and productivity for its customers."

Energia_LOPEZ-ZUBIETA-ALVARO-ANDRES

Álvaro Andrés López,
Commercial director, CPG Cummins de los Andes