CONSTRUCTION

SCROLL

FIRST AVAILABLE SUITE
APRIL 2021

  • Modular growth

  • 24 areas. 2000 sq. ft. each

  • Adjustable hydraulic platform available to freight and cargo vehicles for the equipment unloading in the Data Center.

  • 3-meter door height

RENDER OF THE PROJECT

FLOOR-TO-CEILING DISTANCE ADVANTAGES ZETTA DC

Standard 48 RU rack handling,

Better tray distribution on multiple levels.

3-meter door height clearance allows access to cutting-edge racks.

2.5-ton Cargo elevator and more than 3-meter height clearance in the cabin.

Enables hot air collection in white areas, improves thermal efficiency.

80 cm raised floor, enables free air flow from trays, not affecting thermal efficiency.

JUST AROUND THE CORNER!
TIER III CERTIFICATION IN CONSTRUCTION

During the UP-TIME INSTITUTE construction certification, a set of in-depth tests will be carried out to guarantee that the built design complies with:

Capacity and efficiency with which it was designed.

Topology and redundancy structure according to TIER III standard specifications including its main characteristic, the ability to be concurrently maintainable.


LEARN HERE HOW IT WAS BUILT

FACADE FINISHING IN SCREEN PANEL

ROOFING EQUIPMENT INSTALLATION

EQUIPMENT POSITIONED ON RAISED FLOOR

RAISED
FLOOR INSTALLATION

EQUIPMENT ARRIVAL START (AUXILIARY PLANT)

NETWORK
INSTALLATION START

SUPERSTRUCTURE
COMPLETION

WALLS
START

CASTING OF MEZZANINE
SLABS

CASTING OF 2ND
FLOOR SLABS

COLUMNS AND SUPERSTRUCTURE START

CONSTRUCTION OF GRADE BEAMS AND FOOTINGS

PILING WORK
START